Kondisi Jaringan Utama D. I. Susoh
Berita Balai •
| No | Daerah Irigasi/ Lokasi | Luas | Kondisi Saluran dan Bangunan | Ket. | ||||||||||||||
| Baku | Fungsional | Saluran/ Bangunan | Panjang/ Jumlah | Baik | Rusak Ringan | Rusak Sedang | (Rusak Berat) | Kondisi Bangunan | ||||||||||
| Baik | Rusak | |||||||||||||||||
| (Ha) | (Ha) | (m) | (%) | (m) | (%) | (m) | (%) | (m) | (%) | (bh) | (%) | (bh) | (%) | |||||
| 1. | D.I. Susoh | 5.966 | 2.100 | Saluran Primer | 1.350 m | 540 | 40 | 270 | 20 | 202,5 | 15 | 337.5 | 25 | |||||
| Bang. pd Sal. Primer | 69 bh | 35 | 50 | 34,5 | 50 | |||||||||||||
| Saluran Sekunder | 28.930 m | 14.465 | 50 | 4.339,5 | 15 | 5786 | 20 | 4339,5 | 15 | |||||||||
| Bang. pd Sal. Sekunder | 310 bh | 155 | 50 | 155 | 50 | |||||||||||||
| Pelaksanaan Konstruksi (Pembangunan / Peningkatan) | ||||||||||||||||||
| Saluran/ Bangunan | s/d 2009 | 2010 | 2011 | 2012 | 2013 | 2014 | ||||||||||||
| (m) | (Ha) | (m) | (Ha) | (m) | (Ha) | (m) | (Ha) | (m) | (Ha) | (m) | (Ha) | |||||||
Kategori
Berita
BWS Sumatera I Turut Berpartisipasi dalam Edukasi Perilaku Hidup Bersih dan Sehat di Sekolah Rakyat
Untuk Aceh Barat yang Lebih Aman, Rencana Pembangunan Pascabencana Mulai Dimatangkan
Setetes Darah untuk Kehidupan, Semangat Kemerdekaan yang Berdampak bagi Sesama
Sosialisasi Kementerian PU Tingkatkan Kesadaran Masyarakat Kelola Sampah Berkelanjutan
Dua Pegawai BWS Sumatera I Torehkan Prestasi di Orientasi PPPK Angkatan VIII 2026
BWS Sumatera I Turut Andil Perkuat Kompetensi Tenaga Konstruksi, Program Padat Karya Digelar di Aceh Besar